Font Size: a A A

Research On Engineering Design Process Optimization Of D Company

Posted on:2018-06-05Degree:MasterType:Thesis
Country:ChinaCandidate:Z HongFull Text:PDF
GTID:2392330620453762Subject:Business administration
Abstract/Summary:PDF Full Text Request
With the engineering design industry design changes,conventional engineering design workflow has been unable to adapt to the current new design methods,compared to large design institutes,small and medium-sized design companies to face this situation is more difficult.As a BIM design company,D company in the use of new three-dimensional design,and set off branch offices,the old workflow has been unable to do a good job of the company's management,resulting in the company's rapid growth in human costs and produce Such as quality control issues,document management issues,document transfer issues,internal communication,long duration,ineffective working hours and other issues,in order to adapt to the company's existing situation,the need for the company's process to optimize the relevant work TheThis article through the study of D company's current problems,around the problem,the D company's existing process analysis.Through the analysis of process problems,find out the causes of the problem and proceed with the solution.D company first through the introduction of advanced data management system to solve the problem of file management and transmission.And then around the data management system to optimize the project process to study.Through the process of implanting a comprehensive quality management philosophy,to achieve the whole process of quality management and control,in order to solve the company's quality control problems and invalid working hours too much problem.Finally,around the data management system,through the ECRS analysis of process management,the existing workflow analysis and optimization,to solve the problem of too long duration,so that the new process can be better in line with D's existing reality Happening.Through the research of this paper,we hope to improve the management level of D company through a series of processes to solve the problems of D company's quality,schedule and cost in development,and help D company to continue through the new information management system development of.And hope to solve the D company project management issues at the same time,provided to similar design companies learn from.
Keywords/Search Tags:Process Improvement, Engineering Design, quality management, information system
PDF Full Text Request
Related items