Font Size: a A A

Research On Design,Construction And Related Issues Of The Transverse Expressway Reconstruction Project For 66kV Usi Lines 1 And 2

Posted on:2020-05-23Degree:MasterType:Thesis
Country:ChinaCandidate:H Y LiuFull Text:PDF
GTID:2392330620453103Subject:Engineering
Abstract/Summary:PDF Full Text Request
For power transmission,overhead transmission lines are not only the bridge that effectively connects the power and the important part of the power grid,but also the most important transmission channel.The technical management of overhead transmission lines is related to the patency and safety of the whole power grid,and also to the reliable output of power energy.Therefore,the reasonable transformation of overhead transmission line technology can not only guarantee the safe output and safe operation of the entire power grid,but also effectively reduce the cost of the operation of the entire power grid,which is far-reaching and significant! This paper analyzes the design and construction management of high-voltage line based on the practical experience of 66 kV usi line 1 and line 2 cross-highway reconstruction project,for the reference of colleagues.
Keywords/Search Tags:Overhead transmission line operation, Operation management, Technical transformation
PDF Full Text Request
Related items