Font Size: a A A

Research On Construction Quality Management Of "Brain Stem" Bionic Structure Building

Posted on:2021-02-26Degree:MasterType:Thesis
Country:ChinaCandidate:Q F LiFull Text:PDF
GTID:2392330611988937Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of the national economy,people are increasingly pursuing a high-quality living environment.Unique,novel,three-dimensional and visually striking buildings have attracted people's attention.A series of influential bionic structural buildings have emerged.,Such as the National Grand Theater,Beijing "Bird's Nest" and so on.In addition to paying attention to the calculation of building structure,such bionic structure buildings should also have high quality and durability.At present,the development of the construction industry is no longer the original extensive model,and it has placed higher and higher requirements on project quality and function."Quality first,safety in production" is our government's requirement for construction enterprises,and it is the guarantee for the sustainable development of society.The quality problems that may occur in construction projects and how to solve them are important issues facing each project manager.This article combines and analyzes the research on project quality management and control in recent years at home and abroad,draws on its advanced theoretical achievements,and on the basis of interviews and investigations,focuses on exploring the problems in the construction quality of "brain-stem" bionic structural buildings.How to combine the application of new technology and new technology with project quality management,and strengthen the process control of the construction quality of "brain stem" bionic structural buildings.This article Take S New Medical School Project as an example,by analyzing the current status of the project's construction quality management,quantitative and qualitative analysis of the factors affecting theproject's construction quality management,and through the PDAC quality management method cycle,an in-depth analysis of the project's specific construction process To formulate technological implementation measures to improve the positioning accuracy of the high-altitude steel truss joints of complex structures with over-limits,and finally promote the improvement of project quality management through construction quality control measures.The project of S New Medical College is a particularly irregular and over-complex structure with rich design and unique appearance.Therefore,the project used new technology in the construction process,adopted scientific and reasonable quality management methods,and compiled specific quality control measures.To ensure the realization of quality goals,and provide reference and guidance for the practical application of quality management of "brain stem" bionic structural construction projects.
Keywords/Search Tags:Construction quality management, steel structure, bionic structure building
PDF Full Text Request
Related items