Font Size: a A A

New Model In Contract Management During Construction Phase Of Construction Project

Posted on:2019-07-29Degree:MasterType:Thesis
Country:ChinaCandidate:C BiFull Text:PDF
GTID:2392330572463657Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Construction project construction contract management is the key task of coordinating the interests of all parties involved in the construction and construction of the project,standardizing the participation of all parties in the project,ensuring the completion of construction quality,schedule and cost control.With the expansion of the project and the scientific and technological construction,the contract management is Construction project management plays an increasingly important role.However,due to many reasons,the project construction contract management frequently has problems,the contract is not standardized,and the lack of professional management talents makes contract claims difficult,and contract performance is difficult.The problem brings difficulties and inconvenience to project management.Based on these existing problems,this paper will give reasonable solutions and suggestions.Based on the current research status at home and abroad and the actual construction experience,the author finds that the non-standardization of contract management is common,contract performance is difficult,contract management procedures are lacking,and claims are difficult.In response to these three major problems,this paper intends to adopt three new models to achieve the purpose of standardizing and perfecting contract management.The following research was done for this purpose:Proposed BIM technology application management mode.Therefore,it is introduced into the construction project construction contract management,in order to realize the effective management and sharing information ensure the contract,to ensure the effective communication of contract information among different participants,and to realize the construction of BIM technology.Application in project contract management to solve the problem of low contract management level;The basic theory based on the SCM supply chain model is proposed.The factors affecting the stability of the supply chain during the construction process are analyzed,and then the emergency plan is used to grasp the total loss caused by the crisis management during the construction phase,and the current situation of contractmanagement performance is difficult;Raise attention to the relationship model existing in contract management.It shows the concepts of human-centered management and flexible management that should be paid more and more attention in modern management.It quotes the thinking on China's economic environment and traditional culture and proposes the impact of implicit relationship on contract management,and draws a contract to deal with China's national conditions.A method of managing claims or lack of procedures.The existence of these three modes in contract management can improve the efficiency and accuracy of contract management.This paper only provides a framework for the technical model of contract management in the construction phase of construction,in terms of the perfection and practical aspects of the management model.Further exploration and supplementation are needed.
Keywords/Search Tags:Contract management, BIM technology, supply chain model, Relationship, Claim
PDF Full Text Request
Related items