Study On Construction Contract Management And Claim

Posted on:2016-04-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2272330464474125Subject:Civil engineering construction and management
Abstract/Summary:PDF Full Text Request
The author studied the construction project construction contract management and claim for the status quo at home and abroad from the historical background of the construction of project construction contract management, and further analyzed and discussed, in the process of access to related engineering data and investigation, by using the investigation and research,data statistics, analysis, research and inductive methods of analogy, found some problems of contract management and claim work in our country, specific include: contract execution is low, the parties to a contract cannot very good constraints; Project completion settlement books have no claims data; Claim the cost often take the form of visa and change order. The claim of construction date is not valued; Counter claim phenomenon is almost zero, etc. So the author summarizes our country at present the project construction contract management level is not high, engineering claims management work also isn’t effective. To solve these problems, the author respectively from the project construction contract and contract claim management work has carried on the detailed discussion research. First of all, starting from the essence and connotation of construction contract, implemented and lift the related content.Then go deep into the construction contract of construction project in our country, tells the story of the nature and the research content of construction contract, find the construction contract management for engineering project construction to ensure the legitimacy of the contract, the standardization, Reduce the occurrence of a breach of contract and contract disputes. To ensure the smooth implementation of the construction projects. And respectively from the angle of the clients and contractors on how to handle the construction contract management, and points out that the contract management is not only in the process of contract implementation management, it should be strengthened in before the contract signing the contract management related work, to ensure that the contract management has a good start, and then ensure the smooth implementation of the contract, eventually to achieve the project goals as the purpose.On the basis of the contract management research, for the claim management of the contract management. The author has carried on the detailed research. The author found that the claim management is the core content of contract management. So the author starts with the definition of the claim, the claim management related procedures, steps and valuation methods, find out the realistic significance of the claims management. The author found that the claim management level height decide the level of contract management, and claims of success ratio can not only to bring economic benefits to the enterprise, also can greatly promote the further research of contract management. From the claim in the study, the author also found counter claim for engineering contract management also has the same importantsignificance. The success of the counter claim will inevitably promote the uplift of the level of claim management. In turn, improve the level of contract management, finally improve is the construction management level of ascension as a whole.Finally, this article in domestic construction contract management and claim the problem in the work, carefully studying the proposed own some views and Suggestions. Hope can help work on the project construction contract management and claim better.
Keywords/Search Tags:Contract management, The construction contract, Claim, Counter claim
PDF Full Text Request
Related items