| The assembly production of a special type of vehicle differs from that of traditional products.The main features are: The technical state is complex,the resource demand is high,the uncertain risk is many,the time node is tense.Causes the project progress control ability to be weak,the delay phenomenon occasionally.Therefore,it is very important to study the development and monitoring of this kind of product assembly project plan.To study the characteristics of a special vehicle assembly project,to solve the project planning and optimization under the condition of limited resources by using the basic idea of the key chain method;Using the assembly practice of a special type of vehicle,combined with the previous comparison method and buffer setting and management as the main means,the project is monitored in real time.Improve the production management means to improve the assembly efficiency.The main contents of the full text are as follows:(1)According to the characteristics of a particular type of vehicle assembly,the need for this product assembly schedule management needs analysis;(2)The establishment and optimization of a special Vehicle assembly project plan based on the key chain method.Study the basic idea of key chain,analyze the characteristics and requirements of complex project management.Aiming at the contradiction of the project dispatching management under the limited ability of resources,the optimization method of complex project plan is summed up.(3)Taking a special vehicle’s final assembly project as an example,using the front-line comparison method combined with buffer set to the real-time monitoring of the progress of a special vehicle assembly project;(4)Improve the efficiency of the final assembly by improving management ability and optimizing management means.The research results of this subject have certain representativeness,which provides a new idea for the progress management of special equipment manufacturing project in aerospace military field,and has some referential significance. |