| Project cost management is an important part of project management,project management in the whole construction project has a key role in work,and the scope of its management has always been the implementation of the project throughout the construction phase.Throughout the whole process of project cost management should be a beginning and end of the project management process,that is,from the early stage of the project feasibility study analysis,investment decision-making phase of the "investment estimation of cost management,construction project construction drawing design stage of preliminary design budgetary estimate of cost management,cost management,cost management of construction drawing budget quota design,construction bidding tender control price management,construction until the project completion phase of the project cost settlement audit management.However,the current in the process of construction engineering project management in China,often for the whole process of construction project construction cost management to ignore,and at the different stages of the construction project implementation of the project cost management is effective and comprehensive,will be very big impact on the cost of the whole project,especially the project cost control ultimately good or bad will directly affect the project investment income,the whole process of project cost management is to improve the investment benefit and avoid project risk,guarantee the project quality,maintenance of the parties’ legitimate rights and interests of the parties,one of the important management thought and method,so the whole process engineering cost management in construction project management is very necessary to a work.The research object "QDIS relocation Sintering project" is located in QDIS new plant area of Lingang industrial park in the port area of Boli town,Huangdao district,Qingdao,Shandong province.It is a turnkey project that needs to complete the whole process of system design,procurement,construction,installation,commissioning,commissioning,personnel training,technical service until completion acceptance and defect repair.This article will combine "move" green steel Sintering project implementation,the actual construction details at all stages of the project implementation process of engineering cost management throughout the project,how are introduced in the project decision-making stage how to reasonable coordination between technology advancement and economic practicality of balance,to help determine the project design scheme and investment estimate preparation management problems;How to guarantee the design scheme selection and optimization during the project design stage;Strictly control the bidding in project bidding and construction phase in the process possible problems,strengthen the audit of engineering change in the process of construction,at the same time,strict control and audit management of all kinds of problems in the construction of the project,the construction drawing budget control within budget;During the project settlement stage,the process,requirements and procedures are strictly required to ensure the accuracy of the project settlement audit.Make this move green steel Sintering the construction cost of the project to get effective control,ensure that the late management phase of the project cost control always within the prophase management stage goals,implementation on the project construction investment,the company achieved good investment returns. |