BOQ Valuation Mode Problems And Countermeasures

Posted on:2017-03-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y C WangFull Text:PDF
GTID:2382330545998595Subject:Engineering
Abstract/Summary:PDF Full Text Request
Since recent years,China has made in the work of building engineering quantity pricing in a greater development and improvement,with the "Bill of Quantities construction norms,"the official emergence and implementation of our work in building engineering quantity pricing of It reached a new height and a new starting point.However,due to China's construction BOQ pricing practice time is not long,but also in the implementation process of the project in the past hampered by a large amount of pricing,so the bill of quantities of construction works the way there have been many in the course of implementation of the defects and deficiencies.Due to differences in the different tenderer for new construction BOQ pricing understood and implemented,leading to the tenderer during the tendering process,its release out of the bidding documents in the list of construction works volume pricing,there are many of defects and deficiencies.Thus making the process of settlement during the construction project,since the building under the bill of quantities mode exists misunderstanding and differences between the legal dispute unavoidable.Against this backdrop,we must increase our popularity and improve building BOQ valuation methods.Firstly,building on our existing BOQ valuation methods were related to the introduction and analysis,then the actual construction works Guangxi Nanning City,a middle school teaching building the fifth project,a detailed description and analysis of the bill of quantities of construction works way in the actual construction project application,has a strong practical significance.In this paper,to be recognized and accepted in the international community mainly the United States the cost of project management,quantity surveying and Japan,the UK engineering Totalizer volume pricing system denominated three projects carried out a detailed description and analysis.Analysis of the implementation of various construction projects volume pricing,development and improvement of China's construction projects to contribute to the amount of inventory valuation.Finally,the Chinese construction BOQ pricing existing defects and shortcomings,gives several methods and measures to solve.This thesis Through a large number of related documents,grasp the macro mode of valuation in the course of development at home and abroad,for more specific inventories conducted a survey on the implementation of the project,have been some of the most intuitive observations and recommendations,Combination 2013 The construction engineering quantity list valuation norms and existing laws,regulations,standards?Specifications Liaoning vocational college of architecture 5 School building projects,bid documents,change,and claims processing And so on,In the field of construction engineering quantity list valuation mode operation,to explore further,while affirming the positive role of BOQ valuation model and its analysis of the problems existing in the process of building market,put forward the corresponding countermeasures to address issues related to,in order to further promote the smooth rollout and implementation of valuation with Bill quantity in China.
Keywords/Search Tags:BOQ, Pricing model, Project cost management, Cost risk
PDF Full Text Request
Related items