| The whole process of public rental housing project operation involving project site project,scheme design,construction of the implementation,operation and management of real estate enterprise internal control process,the public rental housing in the whole operation process there are many problems.Through literature research,field investigation and working experience,it can be seen that public rental housing has not achieved the desired goal.Its main performance is as follows: in the selection of the spatial differentiation phenomenon is prominent,too marginalized,it is difficult to meet the needs of users,supporting facilities are imperfect.In the aspect of project design,designers lack of thought,lack of sense of responsibility,low enthusiasm,and the three side design scheme leads to poor design effect,and the depth is not enough.In the process of building implementation,the management of agent construction units is not enough,and the relevant departments for the construction of public rental housing construction supervision is not enough.In terms of operation,the user access and exit mechanism is not perfect,and the property management level is low.Firstly,the related theories of research,analysis of the origin,the situation of public rental housing,the meaning and value of the topic research,and analysis of domestic and foreign research status for public rental housing and so on.Secondly,taking Beijing as an example,this paper analyzes the problems existing in the whole process of public rental housing project construction in our country,analyzes the existing problems,and puts forward corresponding suggestions and strategies.Once again,the F group Y project in the whole process of construction problems,and put forward corresponding suggestions and opinions. |