| Shuo-huang Railway Development Company major is covered by bus services,public works,electrical works,supply,housing construction,apartments,work content water supply and drainage,heating and etc,the working content exist certain risk factors,We need a reasonable analysis,overall control,in order to effectively pre-control corporate risk and ensure the stable development of Shuo-huang Railway Development Company.First,the study provide theoretical guidance for further study through literature analysis,risk pre-control theory systematic summary.Secondly,this study analysis Pre-control risk management status,built risk assessment target system,which included five items of primary risk indicator and 14 items secondary risk indicator.comprehensive analysis the principles of risk pre-control,processes,monitoring form,identification,risk management.Based on the survey,to determine list of the management class,housing construction,plumbing,heating,cafeteria,bus services and other operations.Again,evaluating the implementation effect of risk pre-control system.The risk accidents caused by inadequate,housing construction,plumbing,heating and other areas decreased than t years ago. |