Font Size: a A A

Research On Risk Management Of BOT+EPC Project Of A Certain Expressway In Guizhou

Posted on:2018-07-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y J YanFull Text:PDF
GTID:2359330518466287Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the country's efforts to increase the highway,the project construction funding gap gradually increased,and the national finance is difficult to support such a large infrastructure project investment.In order to better expand the financing channels,social capital for highway construction,the state to introduce the BOT,to a certain extent,to solve the problem of highway funding gap.However,with the rapid development of the highway market,the construction of the main diversification,diversification of the construction model background,the highway project investors may not have project construction experience and management experience.So BOT + EPC is proposed,but BOT + EPC is a new model of highway construction,the actual operation is not yet mature,many problems,especially BOT+ EPC mode,the risk and control has not yet been resolved,so that the project The implementation process encountered many difficulties.Therefore,to strengthen the BOT + EPC highway risk research,can better promote the construction of highway in China This article has carried out research on this issue.The article based on the BOT + EPC project of Guizhou Expressway,this paper chooses the theory of risk management of BOT + EPC expressway at home and abroad,and through expert interview and questionnaire survey,this paper analyzes the risk management of BOT + EPC highway,Highway BOT + EPC risk factors in-depth analysis,identified based on Guizhou Expressway BOT + EPC four types of risk factors.In addition,a reasonable risk index evaluation system based on the identified BOT + EPC risk factors of the Guizhou Expressway is established.Based on the comprehensive evaluation of the BOT + EPC risk of the Guizhou Expressway,the analytic hierarchy process(AHP)To the Yuping Expressway BOT + EPC important degree of sorting.Finally,in view of the importance of risk,the main risk of BOT + EPC of Guizhou Expressway is mainly controlled,and the control risk is better,and the corresponding control measures are put forward.Beforehand,the BOT + EPC for control and management.
Keywords/Search Tags:Highway, BOT+EPC, Risk Management, factor analysis, AHP
PDF Full Text Request
Related items