Font Size: a A A

Risk Identification And Control Research Of Yunmen Temple Historical Block Project In Xiangxiang

Posted on:2017-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y WangFull Text:PDF
GTID:2359330512964352Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,along with our country city continues to accelerate the process of transformation of the old city has become the most important and critical task facing our construction process in the city's historic district.As a special representative of the old city,is a witness of the development of the city,but also for the local residents long-term lifestyle and social customs the projection,it contains profound culture is an inexhaustible motive force for the development of a city.With the high growth of China's economy,the National People's humanistic awareness is gradually improving,emphasis on the historic district is also deepening.In China many city are beginning to increase the protection of the historic district development efforts but in the history of the street.The transformation process zone there are a lot of problems,improper development and construction is likely to lose the vitality of the original Historic District,more serious will also cause irreparable loss.How to reasonably plan,orderly construction projects to better protect and renovation of historical street area,so it can become a city the window to better show a city of unique charm,is a realistic question which we need to think about and make a wonderful answer.Based on the theory of project risk management system as the basis,uses the method of case analysis,several methods of hierarchical analysis method to research related to the planning of the possible risk of Xiangxiang Yunmen Temple historic district quality reconstruction projects in the process of recognition and evaluation,and according to the treatment given its risks in the risk accordingly.The planning section mainly adopts case analysis method,analysis of the main source of project risk,its source is mainly divided into two parts of a project before construction and construction.Through the establishment of index system,using AHP to determine the two main risks to financial risk and construction risk,then the specific risks such as Investment risk,financing risk,project risk,project construction risk analysis.Then through the risk assessment process based on the method of calculating risk probability and risk cost,in order to determine the level of project risk.Finally,according to the different risk factors exist,according to the risk transfer,relief,retention,avoid these risk control strategies the corresponding specific and effective risk control measures.The possible risk of Xiangxiang Yunmen Temple historic district reforming project identification,assessment,through the calculation of the model of risk assessment of the project,the project does have a certain risk,and the financial risk,construction risk control strategy is presented.The innovation of this paper lies in the theory of engineering project management into the practice of China's historic district renovation project,through the analysis and identification of the risk of Xiangxiang Yunmen Temple historic district quality improvement project,the risk aversion of the project,the optimization of social resources allocation.This study can hope for the future of other projects involved in the transformation of the old cityTo provide effective reference and guidance to solve the problem of the transformation of the historic street block.
Keywords/Search Tags:risk control, risk level, financial risk, construction risk
PDF Full Text Request
Related items