Font Size: a A A

Research On Financing Risk Management Of B Sewage Project In A Sewage Treatment Plant

Posted on:2017-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:F LiuFull Text:PDF
GTID:2359330512460267Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Infrastructure is the foundation of a nation's development and fundamental, accelerate infrastructure construction is very important. For environmental protection, environmental protection infrastructure construction is the foundation of implementing environmental protection, but also the implementation of the national "much starker choices-and graver consequences-in planning plays an important role in promoting the concept of green and so on five big development. Based on this, this study with A sewage treatment plant as the research object, using qualitative and quantitative, integrating theory with practice and SWOT analysis method, in view of the infrastructure construction investment and financing problems, especially based on risk management of BOT financing model, carried on the thorough ponder and research, in order to provide the basis for the financing risk of the enterprise management and reference.Overall, the content of the study are:The one is the risk management theory analysis. Under the background of BOT project, based on control theory, efficiency theory and the theory of public goods theory of project financing risk, such as for below risk identification, assessment, and to provide theoretical guidance.The second is risk management optimization design. According to A wastewater treatment plant BOT project construction and development present situation and the existence of various risk problem, and on the basis of the related theory of risk management, the project risk factors existing in the identification and analysis, and using AHP analysis method, has carried on the empirical analysis.The third it is safeguard measure risk management scheme. Based on the above theory and empirical analysis, this paper puts forward the environmental protection of BOT project financing risk management measures, including security, system security and measures to guarantee three categories, in order to optimize the BOT project risk management macro pointed out the direction of the micro environment.Along the "all in all, this article theory reveals, the status quo analysis, program design, measures to guarantee" the train of thought, of A wastewater treatment plant BOT financing risk management question has carried on the system analysis, study to avoid risk from organization, system,management and other aspects of the proposal has obvious positive significance, this in the BOT financing risk management for the enterprise, provides the reference for rich investment theory has carried on the beneficial exploration.
Keywords/Search Tags:BOT project, Financing risk management, The AHP analysis method
PDF Full Text Request
Related items