Font Size: a A A

Research And Analysis Of The Management System For Site Selection Of Baoshan Central City Construction Project

Posted on:2017-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:C ChenFull Text:PDF
GTID:2358330512463512Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Construction project site selection planning management, urban planning administrative departments according to the urban and rural planning and relevant laws and regulations to confirm the plan of site selection for construction projects, and issued by the administrative work of construction project site selection. Construction project site selection is the precondition of land use planning and engineering planning permission, and is the first step of the planning management, is the key of the implementation of urban planning, it can not only relates to the construction project smooth implementation, but also directly related to the surrounding land project layout, and the development trend of impact area, the city's function and the possibility of balanced and sustainable development.Paper system introduces the baoshan city construction project site selection significance research background, the project management system, and urban and rural planning administrative department of the research and application status quo of business for examination and approval system, further determine the research direction of the paper, main content and the specific work; In the business analysis section, this paper has made a analysis to the original business process planning bureau of zhengzhou city, and then according to the actual needs of the working process have been adjusted, the optimized business processes are given, mainly USES the means of information management, unified management of the working process of the construction project site selection, application of analysis to optimize the location, project preliminary examination, reconnaissance, the project of the public, and a review certificate issued such as business process, data archiving. Paper through the analysis of case description, is clear about the main function of the system, gives the baoshan city construction project site selection management system has the function of the total package diagram has system of sub package diagram; Chapters in data analysis, the paper through the analysis in order to ensure the normal operation of system function of the relevant examination and approval of need to deal with the data, draw the entity class diagram, and the database table structure was formulated; Paper finally, the author summarizes the work, and the efforts of the direction was prospected.
Keywords/Search Tags:urban planning, Construction project site selection, Information systems, requirements modeling
PDF Full Text Request
Related items