Font Size: a A A

DXY Company Coal Chemical Project Selection And Process Research Of Coal Tar Hydrogenation Unit

Posted on:2018-07-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y C YuFull Text:PDF
GTID:2351330518971723Subject:Chemical engineering
Abstract/Summary:PDF Full Text Request
Enterprise selection and implementation of the construction project,directly decides the future development of the enterprise.Against a company as the research object,this paper projects on the company choose to do a thorough empirical study,and proposed to against a company mainly produces device-coal tar hydrogenation technology made a comparative analysis.Against the company was established in October 2012,large-scale coal chemical enterprises,the construction of address for fugu county of yulin city of shaanxi province.Company since its establishment,the coal energy external macro market and the influence of the internal environment,around how to choose the construction enterprise project management is larger,so that the project construction has been greatly restricted.At the beginning of the project launch,project intends to use the local rich coal as raw material,adopting low temperature coal carbonization technology production carbocoal(carbon),coal tar and gas produced at the same time.From part of by-product gas CO and H2,CO and part of the H2 production of methanol by methanol device,another part of the H2 through light oil products,coal tar hydrogenation unit production surplus gas as the fuel of the boiler to produce steam,and at the same time processing device matching construction and auxiliary production facilities and utilities.Due to the current state of methanol unit construction scale of barriers to entry and domestic methanol prices keep falling,and the upstream temperature coal dry distillation technology in the production of gas H2 content in lower than expected,the original project options on the applicability and economical efficiency has met the challenge.This paper and by applying the theory and method of enterprise project selection in affecting against a company resources conditions of the construction and development,management system,industrial policy,industrial structure and other important competitive factors in-depth investigation,and in a lot of firsthand material,on the basis of comprehensive analysis against the company's internal and external environment and the development opportunity and challenge,advantage and disadvantage,put forward against the company's future development of the construction of the project implementation plan and process diagram,and in view of the current domestic mainstream of coal tar hydrogenation technology has made the comparison and analysis,put forward some concrete Suggestions,hope healthy and rapid development for the company to provide valuable reference.
Keywords/Search Tags:project selection, project design, coal tar hydrogenation, environmental protection
PDF Full Text Request
Related items