Font Size: a A A

Research On R & D Project Time Management Of Smart Phone LCD Module

Posted on:2017-04-11Degree:MasterType:Thesis
Country:ChinaCandidate:L H HeFull Text:PDF
GTID:2349330512452896Subject:MBA Business Administration
Abstract/Summary:PDF Full Text Request
With the ever-changing technology, mobile phones are constantly upgrading. Now, smart phones have been very common in people's lives. LCD screen as an important part of smart phones, smart phones small and medium size panel technology is also constantly in the rapid advance. In the smart phone small and medium size LCD panel production industry, mobile phone screen module R & D project time management is particularly important. The shorter the R & D time, the easier it is for the business to grasp the market opportunities. However, the smart phone LCD screen module R & D project is a very complex project, involving a wide range of complex and demanding projects; need to invest a lot of manpower, material resources, financial resources, time and other resources. How to improve the management level, speed up the development of smart phone LCD screen module progress has been the concern of business operators is also an important factor in the assessment of many enterprise resource allocation factors.Based on the theory of project time management, this paper refer to an international medium and small size of LCD panel company's time management technology, describes the basic knowledge of project time management and the basic concept of network planning technology, with emphasis Analysis of the Application of Network Planning Technology and Critical Path Algorithm and Knowledge in X Company. In this paper, X company smart phone LCD screen research and development project time management as the background, leads to problems and points out the purpose and significance. According to the requirements of project management, project schedule and resource requirements, the network plan technology is used to prepare the schedule. According to the project schedule, network map and resource optimization, identify the critical path, and the use of resource balance method to optimize the critical path, reduce project planning time and adjust and optimize the critical path. Finally, summarize some practical experience and method of project schedule control.In this paper, the research method of theory and practice is applied to research the time management of mobile phone screen module development project, which can help our peers in the same industry to master and study the time management methods of similar enterprises.
Keywords/Search Tags:Mobile phone screen module project, time management, critical path, project schedule
PDF Full Text Request
Related items