| This thesis makes a comprehensive analysis and evaluation on the possible environmental influence exerted by the development of new energy and renewable energy sources of Gansu province, aiming at reduce the negative impact of development activities. By analyzing the environmental limitation of development activities in key areas, the paper focuses on the main three issues of the development of new energy and renewable energy sources of the 12 th Five-Year Plan in Gansu Province in order to protect environment.The issue of development scope- the study makes attempt to analyze the rationality of development location and scope by discerning the constraints of environment and observing the location feature of new energy and renewable energy sources developing areas from the view of environmental protection.The issue of development timing-the writer evaluates the rationality of the development planning by analyzing the national industrial policy and preferential development orientation of market economy(including the guiding factors of social and economic development planning, industrial development planning and provincial overall planning).The issue of development of pollution control-aiming at reduce the impact of new energy and renewable energy sources development, the study offers some solutions to ecological protection and pollution control based on different environmental factors. They may provide basis for environmental protection policy decision, prevent and slow down the negative influence of environmental development, meanwhile, evade the risk of ecological, environmental and investment problems.The key content and special setting of the thesis correspond to environmental management requirements of involved areas. Overall consideration of the relationships between resources and environmental factors lead to planning focus on the impact upon ecological system and comprehensive effect. The content and depth of the study give full consideration to the attribute and levels of development planning. The writer makes suggestions to macro decision-making and environmental management based on the requirements of different attribute and levels. The study underlines the advantages and disadvantages of the development of local environment and resources; clarifies the current situation and problems of new energy protection and utilization, relations of local sources and new energy development; analyzes the feasibility of development planning in the aspects of distribution;12th Five-Year from gansu province new energy and renewable energy power and new energy and renewable energy resources endowment situation in gansu province from two aspects of carbon reduction effect analysis, focusing on hydropower, wind power, solar, and biomass of installed, power supply, energy saving and emission reductions are analyzed;From carbon asset values on the regional economic development, employment and poverty alleviation planning carbon emissions of social and economic impact analysis, modes of production and scales. Consequence, the thesis makes a prediction and analysis to possible environmental effects of planning implementation; suggests some measures to slow down or reduce the negative influence on local environment, aiming to offer some suggestions and advice to planning proposal and put forward the proposal of monitoring and tracking assessment. According to the analysis mainly get the following conclusion:1. Gansu "twelfth five-year" hydropower project on water environment in the planning of new energy mainly reflected on the river hydrological regimes, the influence of water temperature, water quality and river aquatic organisms, the influence of ecological vegetation on both sides.Construction units strict executing the water environmental protection measures, it is strictly forbidden to water body pollution;Environmental protection and the relevant departments to intensify supervision, strengthen the management system, water in natural rivers dilute purification, the program will have great influence on the internal environment.2. Planning construction by direct combustion of biomass project in tianshui, zhang ye, jiuquan, qingyang and longnan, environmental air quality is better at present, capacity is bigger, so plan to direct combustion of biomass projects under the premise of rational and feasible management measures, to contribute less air pollution in the area of environment.3. According to the optical power plant has been built in the wind, the completion inspection and acceptance of environmental protection monitoring, you can see that its operating period noise all can meet the standard requirements, and the planning of wind, photoelectric bases are located in the open area, the surrounding residents is less, therefore, not to adversely affect regional acoustic environmental quality and residents.4. New energy since the implementation of the 12 th five-year plan can be realized at the end of the 12 th five-year obviously reduce pollutant emissions, which can reduce the pressure of atmosphere environment bearing in gansu province, improving the environmental air quality, can be an annual 47.01 million tons of co2 emissions, annual produce emissions reduction benefits of 940.28 million yuan, environmental and economic benefit is obvious.5. Land resources can completely satisfy the planning of wind, photovoltaic project implementation.New energy development and the proportion of the total area of the available land area is very low, and is located in the desert, gobi area, regional productivity is low, the planning and implementation of the provincial ecosystem will not cause the overall degradation, but should pay attention to ecological environment deterioration and recovery. |