Font Size: a A A

Study Of LHNP Nuclear Power CO.,Ltd Spare Parts Procurement Management

Posted on:2017-04-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y GuoFull Text:PDF
GTID:2349330488458802Subject:Project management
Abstract/Summary:PDF Full Text Request
Spare parts production enterprise operation is an important guarantee, is related to the development of the enterprise and management benefit. In the premise of safety first, you also need to better and faster development., unlike traditional energy power generation enterprises, one-time investment cost more nuclear power enterprises, more sophisticated equipment, technical difficulty is bigger.To ensure enterprise in the field of clean energy more, and obtain a higher economic efficiency, the crew utilization of nuclear power enterprises need to maintain a very high level, so for the procurement of spare parts timeliness, reliability and stability of the supply requirements more stringent. If the disastrous consequences of nuclear accident, not only endanger the survival of enterprises, to the serious negative impact on society, causing panic. A single nuclear power units in the process of construction, the amount of purchasing items by more than 40% of the investment of the unit, the discretion of nuclear power enterprise procurement work quality, not only directly affect the enterprise's operation and maintenance costs, the effectiveness of the investment control. At present, the domestic nuclear power enterprises in the procurement management in the initial stage, low efficiency, optional the gender is big, also is limited by the requirements of nuclear safety regulation, inadequate supplies enterprise's competition in the market, increased the enterprise the management cost, in order to better adapt to the current power market, and control the quality of the material purchasing, forcing enterprises innovation management mode.Therefore, this research in the lead time of the nuclear safety regulation, the enterprise benefit maximization principle, investigating the LHNP nuclear power company in the field of spare parts procurement management system, management process and operation method, put forward LHNP nuclear power company difficulties and problems in purchasing management, considering the special requirements of the plant, and improve the spare parts purchasing management, combing enterprise purchasing management process, shorten the supply cycle, ensuring the quality of material and improve the enterprise's ability to resist risk, etc to make continuous and stable development of ability, and demonstration effect on other construction of new nuclear power projects.
Keywords/Search Tags:Spare Parts, Inventory Control, Purchasing Management, Supply Chain Management
PDF Full Text Request
Related items