Font Size: a A A

The Design And Implementation Of Distribution Network To Repair Elaboration Management Analysis System For Weihai Power Company

Posted on:2018-01-26Degree:MasterType:Thesis
Country:ChinaCandidate:H Q ZhaoFull Text:PDF
GTID:2348330542454107Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the utilization rate of various types of power grid facilities continue to improve,the scope of application gradually wide,and the related to the number of various types of power distribution failures are also gradually increasing,the rush repair of distribution network faults has become an important part of the daily work of power supply departments at all levels.Companies need to establish a more comprehensive coping mechanism,timely deal with various types of distribution network failure,to ensure the safety and stability of the production environment.In the existing rush repair mechanism of Weihai power supply company,there are some problems such as irrational personnel allocation and poor timeliness.Therefore,the company decided to carry out the design work to achieve the analysis system for refine rush repairs management of distribution network.In the design and implementation of the analysis system for refine rush repairs management of distribution network in Weihai power supply company,the system uses the B/S architecture,MVC design patterns,SSH framework and Oraclellg database and other technical forms.Based on the MVC design pattern,the system is responsible for the level of the partition by using the SSH framework.Oraclellg is a large-scale distributed database technology,which can effectively improve the efficiency of the system function server.The analysis system for refine rush repairs management of distribution network in Weihai power supply company accomplishes the functions of real-time monitoring and management,repair analysis,correlation analysis,allocation analysis and so on.The real-time monitoring management achieves the monitoring of the daily trend of distribution network failure,the work intensity analysis of the power supply company,and the follow-up analysis of the emergency repair process and other functions.Repair analysis realizes the standard analysis of the length of repair,the analysis of the efficiency of rush repair,and the analysis of the city's emergency repair and other functions;Correlation analysis implements the three-dimensional analysis of the relationship between the number of failures,three-dimensional analysis of the relevant factors and other functions;Allocation analysis implements the number of fault statistics analysis,repeat the breakdown of statistical details,user false positives and other functions.After the system is put into use,the distribution network rush repair work of Weihai power supply company and its subordinate institutions are comprehensively combed.Through the establishment of a more sound monitoring mechanism,to track the status of the work orders of the subordinate offices and other institutions,to grasp the specific situation of its handling,and through a more rich and comprehensive analysis of statistical methods for the daily work of the agencies to provide an important reference to comprehensively enhance the company to deal with all types of distribution network rush repair failure.On the basis of establishing a sound and timely response mechanism,it provides sufficient guarantee for the safe and stable production environment of all industries.
Keywords/Search Tags:Realtime monitoring management, Repair analysis, Correlation analysis, MVC, SSH
PDF Full Text Request
Related items