Font Size: a A A

The Thermal Power Plant Of Real-Time Consumption Analysis System For Yunnan Can Invest In The Group Under The Thermal Power Plant

Posted on:2018-08-11Degree:MasterType:Thesis
Country:ChinaCandidate:W YiFull Text:PDF
GTID:2348330512984583Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In today's society,the energy consumption is large and the supply is becoming more and more tense.Not only that,the electricity market becomes more open with the social development,so it is very important to optimize and guide the operation of thermal power plant units.The real-time consumption analysis of thermal power plant is an important basic theoretical work to realize the optimal operation of thermal power plant units.According to the actual situation,this paper hopes to build a real-time consumption analysis system subordinated to Yunnan Provincial Energy Investment Group,which can save energy and promote development.The real-time consumption analysis system of the thermal power plant subordinated to Yunnan Provincial Energy Investment Group was developed by SSH framework,B/S architecture and MVC model framework.The data acquisition,access and analysis were carried out by SQL SERVER 2014 database system.In this system,B/S architecture was the choice of design concept,SSH architecture was the key to build hierarchical code and system,and MVC architecture was the technical guide of the user interaction with the system and the feedback of actual operation.The system was divided into four major modules,namely consumption analysis,shift change management,basic configuration information management and system management.Each module was subdivided into detailed sub-modules.Among them,the consumption analysis included consumption index management,data analysis management,equipment status management and automatic optimization management.Shift change management included shift program configuration,shift regulation configuration,historical records of using shift arrangement and historical records of shift change.Basic configuration information management included professional configuration,equipment configuration,real-time point configuration and manual point configuration.System management included log management,rights management,message management,organization management and system configuration management.The system can realize the reasonable allocation of resources,save energy,save cost and improve efficiency.The system can comprehensively arrange the consumption on whole process including configuration,statistics,analysis,program selection,providing a higher guarantee of the reliability of the entire power supply network.The system has basically achieved the design goals of implementing a safe,simple and perfect system in line with the use of engineering standards,making the more perfect management work of the thermal power plant subordinated to Yunnan Provincial Energy Investment Group,which is conducive to improving work efficiency and reducing operating costs.
Keywords/Search Tags:Real time difference analysis, Transfer management, Basic configuration information management, B/S architecture, MVC framework
PDF Full Text Request
Related items