Font Size: a A A

The Design And Implementation Of Automatic Road Test Management Platform For Qingdao Mobile Company

Posted on:2017-07-11Degree:MasterType:Thesis
Country:ChinaCandidate:X C MaFull Text:PDF
GTID:2348330512450696Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In recent years, with the rapid development of communication technology and the rapid rise of mobile communication network technology, in order to better ensure the quality of roads, a large number of road tests are needed. Through these road test data, the real user behaviors can be simulated, and then find the actual user problems. With constant user problems and a large number of road test data, how to strengthen the management of large amounts of data and improve the application of road test data have been the difficult problem needed to be solved for many businesses. Therefore, Qingdao China Mobile hoped to develop an automated road test management platform to improve their own road test data management, discover user problems timely, so as to enhance their business capabilities and market competitiveness.Qingdao China Mobile Automated Road Test Management Platform used the popular SSH development framework, and a combined with MVC design patterns. While, the system used the browser/server mode, users only needed to use one browser on the client to interact with the server, and then the client interacted with the back-end database through the Web Server. In addition, the system development language was Java language and combined with the JSP development technology. The database was used SQL Server 2014.Qingdao China Mobile Automated Road Test Management Platform achieved five functions, including ATU equipment and test plan management, monitoring management, road test data analysis, GIS analysis of road test data and system management. The functions of ATU equipment management and test plan management included ATU region management, ATU equipment information management, ATU software upgrade management, ATU work process management and test plan management. The functions of monitoring management included event monitoring, alarm monitoring, status monitoring, MOS monitoring, Flex monitoring, LOG list and ATU login log. The functions of road test data analysis including test included test data statistics, automatic statistics, grid statistics, total summary and raw data export. The functions of GIS analysis of road test data included summary statistics, event query, path rendering, grid rendering, grid road and qualitative difference analysis. The functions of system management included account management, authorization management, user self-service, subscription management, announcement management, operation log and manual processing.After being putting into use, the automatic road test management platform improved the level of road monitoring management to a certain extent, ensuring road safety and reducing the company's road monitoring management costs. Certainly, there are some problems of the system itself, such as the system performance can be further improved and the system function also need to be more perfect and simplified, which requiring to further improve the system in the future.
Keywords/Search Tags:Road test analysis, ATU Device, SQL Server, SSH
PDF Full Text Request
Related items