Analysis And Countermeasures On The Risk Of Contracting Parties 2013 Version Of The Construction Contract Model Text Based

Posted on:2016-08-05Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q GuoFull Text:PDF
GTID:2336330461980002Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The 2013 edition of "construction contract (model version)" in July 1,2013 began formal implementation, the two sides signed a construction contract is signed in accordance with the new requirements must model given format contract management of construction contract format terms new to contracting parties have brought new challenges.In order to make the employer understand after using the new model contract, the risks faced in the construction process and master the corresponding coping strategies, in a careful reading of the 2013 edition of "construction contract (model version)" all terms, and learning on the basis of relevant engineering construction in our country in recent years published laws, regulations, regulations and so on, combining with the author's years of engineering construction practice experience, this paper adopts the method of analysis, starting from the signing of the contract and fulfill the quality, progress, investment, security and other aspects of the contract to control, and comprehensively expounds the risks of contract law, the project site management risk, schedule risk, engineering quality, engineering project risk the investment risk and the engineering safety risks in the contract in the form of expression, analyzes the reasons of occurrence of these risks and losses can be caused to the employer. According to the different types of risk and severity of loss, according to the theory of risk control requirements, to take the risk avoidance, risk retention, risk control, risk transfer risk processing method to deal with. In order to make the theory more practical, this paper lists the representative engineering examples, vivid manifestation of the multiple, changeable risk of engineering construction, and the necessity and flexibility of risk treatment. Finally, the employer should sign the contract preparation work began, until the defects liability period and the engineering warranty contract performance stage, must step by step prevention and control, the overall consideration, careful planning, will make the risk the employer has been effectively controlled, to achieve the expected goal of Engineering construction.By reading this paper, in to contractor risk warning to the construction projects at the same time, also to the employer in the construction contract signed, in the process of fulfilling the contract, control and treatment of all kinds of risk also have certain realistic directive significance.
Keywords/Search Tags:the 2013 version of the construction contract model text, the employer, risk, analysis, Countermeasures
PDF Full Text Request
Related items