Font Size: a A A

Study On PPP Financing Mode For The GR Hospital In Caofeidian District

Posted on:2018-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:G F LiFull Text:PDF
GTID:2334330566962963Subject:Business administration
Abstract/Summary:PDF Full Text Request
As China's urbanization process continues to deepen,the infrastructure,such as medical care,housing and other needs,has increased.In order to meet the multi-level and diverse people health demand,put forward new reform ideas since 2009 in our country,to solve the problem of "medical care,expensive",namely the growing health needs,and resolve the existing conflict by the lack of medical resources.There are two ways to solve this contradiction.One is to increase government input,and the other is to introduce social capital.With the introduction of social capital,and promote the social investors and government cooperation,accelerating the construction of the public infrastructure PPP model can solve the problem of the source of funds,the ownership of the hospital public welfare nature remains the same,and at the same time can guarantee the same.Caofeidian area,meanwhile,is in Hebei province,Tangshan municipal districts as companies to the investing,Tangshan Caofeidian universities moved to Caofeidian,the enormous influx of population,and the medical facilities equipped with the imbalance between appear.Therefore,to speed up the construction of the city,we need to improve the medical condition,improve the medical level of Caofeidian district,and ensure the maximization of public interests.First of all,the PPP project financing model to Caofeidian area GR hospital related literature review,this paper summarized the research background,research significance,and puts forward the research question,summarizes various scholars for hospital PPP project financing structure involves the main theoretical points,inductive hospital PPP project all the possible USES of PPP financing model.Secondly,this paper introduces the project situation of GR hospital in Caofeidian district,the scope and current financing situation,and understanding the internal situation of GR hospital project in Caofeidian district.Secondly,through the PEST-SWOT model,the analysis of the project in the Tangshan Caofeidian district in the policy,economy,society,technical external environment and internal advantages,disadvantages,opportunities and threats.And according to different environment,different strategies are formulated to help the project of GR hospital in Caofeidian district to develop better.Meanwhile,use financial indicators to analyze the feasibility of financing projects.Then,understand the project contract system and stakeholder needs,in combination with the practical situation of Caofeidian area GR hospital project,compared with the existing hospital PPP financing model,toll pricing mechanism and basic framework of the project investment income level,risk allocation,financing needs and requirements,and disposal of the expiration of the reconstruction and factor analysis,the advantages and disadvantages of the various financing model,to make Caofeidian area GR hospital project design the best financing mode.The implementation process of the project is further elaborated from the preliminary stage of the project,the bidding stage,the implementation phase and the end stage.Finally,the risk sharing,supervision measures and policy Suggestions are put forward for the PPP project of GR hospital in Caofeidian district.Therefore,the PPP model is adopted to improve the medical resources construction,the reform of public hospitals and medical facilities construction,promote the improvement of the construction of medical service,can alleviate the pressure of the government finance,play to the role of the market competition mechanism,improve the efficiency of capital operation,realizing multi-win-win situation.
Keywords/Search Tags:the Caofeidian area hospital of GR, PPP financing model, SWOT analysis, implementation measures
PDF Full Text Request
Related items