Project Progress Risk Management Of 110KV Substation In Liangshan Dongtian

Posted on:2018-06-09Degree:MasterType:Thesis
Country:ChinaCandidate:W WangFull Text:PDF
GTID:2322330542978106Subject:Engineering
Abstract/Summary:PDF Full Text Request
The power industry is the foundation of the national economic development.The large-scale construction of the power industry involves many interests and attracts wide attention.Especially,due to the long construction period and complex construction environment,the power grid project affected the construction period of the project to a certain extent.Under the premise of ensuring the quality of the project,all parties of the power grid construction hope that the project can be completed within the prescribed time limit,which requires scientific management of the construction of the project,and pays special attention to the management of the project progress and the active prevention of progress Risk,thereby enhancing the efficiency of power grid project investment and construction of enterprise management.Based on the situation and actual needs of power grid construction in Xichang Electric Power Company,this paper puts forward the idea of "comprehensive progress management" as the core.Based on the related theory of project progress management and risk management,this paper chooses the construction project of "Dongtian 110 KV Substation Construction Project " in this specific case to explore its project risk management and analysis;try to project progress risk management and progress control of traditional methods together as a " double protection " of progress management.This article first elaborates the background and significance of the research,the content and method of the research,and then reviews and summarizes the current research situation in relevant fields both at home and abroad;then,it makes necessary reviews of relevant theoretical knowledge points and methods of project progress and risk management;then analyzes According to the core content and key steps of project risk management,the progress risk of the construction project of Dongtian 110 KV substation was identified and analyzed.According to the actual situation of Dongtian 110 KV substation construction project,the necessity of carrying out project schedule risk management was put forward.At the same time,based on the idea of comprehensive management and control,the progress risk control and response to the construction project of Dongtian 110 KV substation was explored and analyzed.Finally,it draws the conclusion of the full text research.Based on the author's work needs,this paper discusses how to carry out theprogress risk management of Dongtian 110 KV substation project,especially the project risk identification,evaluation and response according to the project life cycle;put forward the overall management and control conception for progress control,and then To achieve the overall management of 110 KV substation project in Dongtian with a view to better guarantee the efficiency of Xichang Power Company in implementing the grid project construction.It also hopes to provide more scientific and reasonable future construction and implementation of similar grid project in Xichang Electric Power Company in accordance with.
Keywords/Search Tags:Power grid engineering, substation construction project, project schedule management, risk management
PDF Full Text Request
Related items