Font Size: a A A

Research On Construction Design Management Of Harbin Riverside Project

Posted on:2018-07-22Degree:MasterType:Thesis
Country:ChinaCandidate:S JinFull Text:PDF
GTID:2322330542953578Subject:Engineering
Abstract/Summary:PDF Full Text Request
The real estate industry in China in recent years the rapid development of real estate projects have sprung up all over the country.Various types of civil construction was produced in great quantities,at the same time has given rise to the vigorous development of the whole building industry.Construction industry chain on the stages of enterprise development speed is also unusually high speed.Design,engineering,marketing,costs,property,and other industries are in rapid expansion,the enterprise level to avoid the good and bad are intermingled,the sham as the genuine.Work of architectural design as a whole chain of the premise,work content is particularly important.Real estate planning and design work can be divided into the conceptual design,architectural design and construction drawing design,landscape design,fine decoration design,planning and design is particularly important to the advance,the landing of the follow-up project.Harbin Shimao real estate as a brand developer,the scope of business for real estate development,commercial housing sales.Harbin Binjiang New City project is located in Harbin Songbei District.This paper takes Harbin Binjiang New City project as the research object,and studies and analyzes the project planning and design management of Binjiang New Town in Harbin.Through the planning and management of Harbin Binjiang New City project,we can find out the design errors in the planning and design work of the project,especially the underestimated early design problems that can not be expected.In view of these links and conditions,The corresponding measures to prevent and control the design errors and then occur again,as far as possible to do the early design work to do early warning,post-design work to do.Planning and design work to realize the full cycle of the whole process of professional conduct full management control.Firstly,the present situation of the planning and design of Binjiang New Town in Harbin is analyzed and studied,and the management problems such as the neglect of low-level behavior information,the lack of management team and the weak management process are summarized and summarized.Secondly,the other types of the same category,with the quality of the project and Harbin Binjiang New City project planning and management similarities and differences,to compare the case analysis.The design behavior of the constraints,design management team capacity,scientific evaluation and other key factors in-depth study summary.And put forward to strengthen the full level of design behavior,attention to the design stage of key actions,amendments to the work process and other improvements and safeguards.Finally,according to dimensional method is based on the analysis results.Of Harbin riverside project management,project planning and design of the new process management,audit management,proposed to establish and improve the institutional system,adjusting the organizational structure,enhance the quality and cost control safeguards established after the project evaluation.Thesis research results to improve the Harbin riverside new town project is of great significance to the planning and design management,and for other domestic real estate companies to strengthen management of project planning and design drawing.
Keywords/Search Tags:process management, planning and design, overall planning
PDF Full Text Request
Related items