| Railway station reconstruction project has strong comprehensive and compl exity,in construction process has the scope is wide,the size etc,therefore to modify railway station is the tradeoff between good construction and transporta tion of a way to ensure that in the process of the construction can effectively control the traffic and transportation,ensuring that all equipment and train op eration can be normal work,make the yard project is completed.How to cont rol the railway station reconstruction project,constantly optimize the constructi on scheme,the use of construction organization and management,and other rel evant matters is essential to the construction and management of railway statio n construction,also is the key of the whole construction scheme optimization.This article mainly Xu Shui station scheme optimization and the research of th e reconstruction project,in order to improve the production quality and efficie ncy of construction,organized for production and construction,ensure the con struction quality,construction safety and construction period can be in accordan ce with the relevant provisions.In the process of research,this paper based on the actual situation of the reform,station and yard Xu Shui station,the diffic ulties and problems existing in the process of construction is analyzed,and the corresponding optimization and to a great extent,improve the quality of the project.Secondly,this article also Xu Shui station yard construction scheme of the reconstruction project of construction period and construction mode is opti mized,strictly in accordance with the principle of yard of the reconstruction p roject construction,optimize the station engineering,has obtained certain achiev ements. |