Font Size: a A A

Application Of Expressway Construction Risk Management In XunQuan Highway

Posted on:2018-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:Q ChenFull Text:PDF
GTID:2322330536478526Subject:Project management
Abstract/Summary:PDF Full Text Request
Expressway construction project environment is extremely complex,its construction period is long,involving more departments,high technical requirements,involving a wide range of projects affected by more factors,the entire construction cycle may encounter inevitable risks,this pair Highway risk management put forward a very high demand throughout the project construction cycle,the risk is everywhere,in order to ensure that the project is not subject to excessive risk,to ensure that the construction project on time,by volume,risk management becomes Very important.China's project risk management is still in the initial stage,lack of theoretical knowledge,practical experience is not enough,risk management for the emergence of more risk after the deal,the lack of forward-looking,do not attach importance to pre-risk forecasting,business and the country caused a huge With the rapid development of China's economy in recent years,a variety of advanced management concepts into China,many foreign-funded enterprises have also settled,which for our construction risk management to create a good learning opportunities.This paper analyzes the risk factors in the construction process of the expressway project from the aspects of progress,cost,safety and quality,and analyzes the actual situation of the construction project of the contract section of Xunwu to Quannan Expressway This paper analyzes the risks existing in this project by using analytic hierarchy process(AHP),analyzes the main risk factors based on the analysis and calculation results,and puts forward corresponding countermeasures for these factors.The research results of this paper provide a theoretical basis and practical reference for highway construction risk management.
Keywords/Search Tags:highway, Construction risk, Analytic Hierarchy Process, preventive solution
PDF Full Text Request
Related items