Under the background of rapid social and economic development in our country,the electric power industry has made great progress,and the environmental pollution has become increasingly serious.With the introduction of relevant national policies,the coal-fired power plants have been carried out flue gas desulfurization transformation.DJJ power plant promote the flue gas desulfurization project in energy-saving emission reduction,control sulfur dioxide emissions,and actively protect the environment.Because of the importance and complexity of FGD project,which is significant to study the schedule management of FGD project in thermal power plant.It is very necessary to study the schedule management of FGD project in DJJ power plant.According to the research of flue gas desulfurization project progress management of thermal power plants in the season,expounds the design of power plant project implementation conditions and the original schedule,clear the influence factors of project schedule and project process node problem,critical path method is used to adjust the project schedule,from the start of the project,market research engineering design,equipment delivery,equipment installation,commissioning,acceptance and other sectors to adjust the project schedule,the project schedule is more in line with the actual needs,effectively ensure the project in time.Discuss the implementation of standardized concept of project schedule management problems,put forward specific measures of conception in each project organization,project communication,project supervision,drawing review and the division of responsibilities and so on,the dynamic observation and inspection in the process of project implementation,project progress timely processing problems,to reduce deviation of project progress,implementation the overall goal of the project schedule. |