Font Size: a A A

Study Of Freight Dedicated Line Freight Train Operation Plan Based On Transit Period

Posted on:2018-03-22Degree:MasterType:Thesis
Country:ChinaCandidate:F Q ZhangFull Text:PDF
GTID:2322330521950818Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
With the globalization and the rapid development of modern logistics industry, freight transport more and more emphasis on efficiency and quickness, convenience and punctuality,unimpeded information,and railway freight transport exists the problem that freight delivery to delay, it is not conducive to the development of railway freight market. Freight train operation plan as the core technology and the guidance documents in the cargo transport organization, the rationality of its establishment directly affects the production efficiency and transport service levels, relates to whether the goods time can get effective guarantee, so the paper proposes the freight railway freight train operation plan compiling theory based on transit period, and further study of the strategy and key technology of freight railway freight train operation plan.The main work and research contents of the paper as follows:1. The development of railway freight transport market situation and development trend are analyzed and summarized, analysis shows that the goods shipped to deadline cannot guarantee is the main cause of the rail freight market weakness, summarized the domestic and foreign transportation organization mode, found that China's current freight organization mode does not adapt to the market demand of transit period, so the paper proposes the freight transport organization concept based on transit period.2. Orienting the demand of freight market, the paper proposes the freight train operation plan theory based on freight transit period, and study the relationship of transit period and the freight train operation plan, the principle of operation plan establishment, influence factors, and analyzes the favorable conditions of rail freight line adopting operation plan establishment mode based on transit period.3. The paper further studies the strategy and the core technology of railway freight line freight train operation plan, and puts forward two requirements of operation plan establishment based on transit period, that dynamically compiling on the basis of real-time freight flow and adopting the dynamic marshaling organization mode. Through the introduction of goods transport time value coefficient, the paper studies the calculation method of the minimum number of marshalling units in the dynamic marshaling mode, and designs the dynamic compiling strategy of the freight train operation plan based on the feedback control principle, and analyzes the freight flow organization method based on freight transit period,and inductive analyses the overall process of operation plan establishment based on freight transit period.4. Based on the maximum cost of traffic flow, the maximum economic benefits of the non-stop train and the maximum benefit of the transit time, the paper establishes the multi-objective nonlinear mixed integer programming model of freight train operation plan based on freight transit period, and builds an example proves the rationality of model, which provides a technical reference value to solve the problem of transport of goods to the extension.
Keywords/Search Tags:Transit Period, Freight Dedicated Line, Freight Train Operation Plan, Dynamic Marshaling, Dynamic Establishment
PDF Full Text Request
Related items