Font Size: a A A

A Dormitory Area Mills Project Cost Control Program Design And Implementation

Posted on:2016-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:G ManFull Text:PDF
GTID:2322330521450484Subject:Project management
Abstract/Summary:PDF Full Text Request
Residential construction project to build a steel plant with a new look,especially for A mill and that part of the area of the existing dormitory area can not meet the current demand for construction production and living.In order to effectively implement the"speed up the construction of modern residential quarters opinions",A steel mill in order to further improve the working and living conditions,production strategies to meet the needs of modern construction workers,so A proposed new steel mill project.However,the annual budget funds A dormitory building only a small part of the steel mill,and how we can improve dormitory construction project with minimal cost it?This requires dormitory building good financial management costs,as well as the use of good cost control.This is the main purpose of this article.A steel construction of the actual situation of the project clear,the principles and conditions demand dormitory construction project,the project brief overview.Combining the characteristics of dormitory construction project,the specified object dormitory construction project cost control of content,cost control at every stage of the project are not the same content,that is,speak dormitory construction cost control has its own unique characteristics,it is a comprehensive,stage and professional basis.For dormitory construction and project cost control analysis,each one has its own characteristics,which can indicate awareness and imagination,systems,methods and procedures of factors will impact dormitory construction proect cost.Correlation analysis through case,dormitory construction project cost control problems further proposed a "dormitory residential construction project cost control plan"issue,mainly from five levels,the principle of a program designed to follow the principle of program design principles Feasibility simple principle;the second is the design and implementation of the program has its time and implement cost control concept;third,through the establishment of organizational system and institutional system,improve cost control system;fourth,all phases of the organization and management of project implementation;five a construction project cost control flowchart.In the beginning of the project design phase,the project manager to select the best project follow-up project cost management provides a good start.In this stage of the implementation process,the designers focus on design considerations,environmental design,construction design,structural design and other factors.During the construction preparation stage,the leading group for pre control operating costs,and strict selection team members,strict management of construction machinery,materials testing and other content approach.During the construction phase,through cost control methods and technology,financial methods,project cost variance analysis and cost control,cost control table and a good acceptance and completion of the settlement of audit work stage.Final acceptance and settlement of audit should adhere to the principle of seeking truth from facts,combined with the actual costs in accordance with the requirements of the contract change,construction,comprehensive review and audit concerns combined method for final settlement approval.Cost control program design depends on the smooth establishment and strengthening of a sense of responsibility cost management and control systems.Mainly in the following measures:first,improve quality,strengthen the sense of responsibility;second is to establish constraints and incentives,good cost control efforts on three key aspects;fourth good project cost control during dynamic;5 is to establish the project cost control information system;six is to improve the monitoring and evaluation and reward system.Dormitory construction project,only the rational use of human,financial and material resources,in order to improve efficiency in the use of military force,and optimize the allocation of resources limited the power of good,in order to establish a framework,humanities,management,integration of modern hostel,continue to promote the modernization of mills.
Keywords/Search Tags:Dormitory area, building projects, project cost control, control scheme
PDF Full Text Request
Related items