Font Size: a A A

Research On International EPC General Contracting Project Risk Assessment

Posted on:2018-03-09Degree:MasterType:Thesis
Country:ChinaCandidate:H LiFull Text:PDF
GTID:2322330518460794Subject:Business Administration
Abstract/Summary:PDF Full Text Request
As the global economy development, our country in the aspect of deepening reform and opening to the outside business also unceasingly to expand in various fields,which makes the domestic contracting construction industry in recent years in the development of effective, contract in domestic construction industry has occupied a large proportion of the construction industry. International EPC mode in our country is still relatively new, is currently only being used in chemical industry, electricity and other less,general contractor in higher profits, strengthen the power of the contract at the same time,to bear the risk of getting higher, and the evaluation system of domestic enterprise itself measures are not mature, management does not reach the designated position, especially to each risk factor management ability is low, makes domestic contracts for construction enterprises in the global general contracting construction projects in the face of the threat of more complex. Only improve the our country of international EPC general contracting project risk evaluation in the discussion and analysis, can only be gradually foothold in this great new international environment, make the enterprise in the new environment with the survival and development, the enterprise can improve economic efficiency on this basis, so that they can quickly deal with the problems that exist in the general contracting project risk evaluation and confused, and in the research of EPC, of course, is the most important for risk assessment of deep thinking and rigorous inquiry.Based on international EPC general contracting project risk evaluation as the research object, USES the theory combined with the case study method, in reference to domestic and foreign scholars on the basis of the research to this problem, combined with an overview of international EPC general contracting projects in China, starting from the definition and characteristics of general contracting projects, international contracting EPC general contracting projects and the traditional mode and other common pattern contrast, analysis the characteristics of international EPC general contracting project risk factors. On the basic theory and method of risk identification and risk assessment are studied, and according to the basic principle of general contracting project risk indicators to build, build a wealth of international EPC general contracting project risk evaluation index system, including the four large index, index of concrete can be divided into international, index, market indicators and other indicators, and 25 secondary indexes.And innovative use of analytic hierarchy process (ahp) and fuzzy comprehensive evaluation method of index weight calculation, and the fuzzy grade calculation, the quantitative and qualitative methods together, make more operable and scientific evaluation model. And, combined with some specific case examples prove that the evaluation model is suitable for evaluation of such problems, has certain promotion and reference. In the process of project implementation, compared with the traditional contract pattern, this pattern makes the contractor faces more risk factors, improves the enterprise decision-making the scientific nature and rationality, aimed at the risk of EPC general contracting mode, using the fuzzy comprehensive evaluation method to evaluate the risk of EPC general contracting project.At present our country about EPC general contracting mode of risk evaluation of exploration is also germination period, so the risk of international EPC general contracting mode of study to search, will be good for Chinese construction companies in the international market to increase a lot of projects, and on this basis gradually establishing clear standards and project development model, for China’s international EPC general contracting projects having the effect that cannot replace.
Keywords/Search Tags:international EPC, general contracting, risk assessment, project management
PDF Full Text Request
Related items