Font Size: a A A

Study On Construction Cost Control Of JY Power Transmission Project

Posted on:2018-02-06Degree:MasterType:Thesis
Country:ChinaCandidate:L M LiuFull Text:PDF
GTID:2322330515969505Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,with the deepening of China’s market economic system reform,cost control get more and more attention for all the industry.Electric power construction enterprises as a profit-oriented micro-economic entities,must attach great importance to cost control.As a core project of the electric power construction enterprise,the power transmission and transformation project has a long construction period,a high investment amount and a large number of personnel involved.The power construction enterprises must pay full attention to the cost control of the project and put the cost control concept and measures The implementation of the project design,construction,engineering supervision and other links,in order to achieve effective control of project costs,and thus achieve long-term development of enterprises.The theoretical significance of this paper is that the cost control of JY power transmission project is comprehensively expounded by using the theory of cost control.The practical significance of this study is reflected in the power construction enterprises in the power transmission project cost control analysis of the problems,can help enterprises find their business management weak links;the second is for the deep-seated causes of the problem The analysis,can help enterprises to analyze from the source up to resolve or appear to be the emergence of various problems;Third,this paper presents a reasonable,effective and feasible cost control work to improve the improvement strategy for power construction enterprises to improve the cost of power transmission projects Control work to provide useful reference.In this paper,based on the deep introduction of cost control theory,JY power transmission project as an example,in-depth study of "power construction enterprise transmission project construction cost control issues," the research objectives include four aspects: Cost control of the relevant concepts for interpretation;the second is the JY power transmission project cost control status,especially the existing problems are analyzed;third,cost control problems arising from deep-seated causes of research;four is for the existing problems And propose the reasonable,effective and feasible improvement and improvement strategy.Specifically,this article is divided into five chapters,the structure of this paper is:The first chapter of this paper research background,research significance,research ideas andresearch methods for a concise discussion on domestic and foreign scholars on cost control,etc.The literature review of the issue and review.In the second chapter,the related theories of cost control are analyzed,and the related concepts of cost control and various cost control methods are discussed.The third chapter analyzes the construction cost control of jy power transmission and transformation project,including the investment decision-making stage,the design link,the construction link and the completion link.In the fourth chapter,the construction cost control scheme of jy power transmission and transformation project is put forward in the stage of investment decision-making,design link,construction link and completion.The fifth chapter puts forward the conclusion of this paper.The innovation of this paper is to use the real engineering situation,based on the development plan of the State Grid Corporation,summarize the experience of demonstration engineering design,and refine the key technology of application,and deeply study the new design method.The establishment of competent departments at all levels,construction and survey and design units to correctly handle the technical and economic unity of opposites,attention to technology at the same time to form a high degree of cost consciousness in a timely manner to change the concept.The deficiency of this thesis is mainly limited to the experience and the availability of data and data,which may not be comprehensive when discussing JY power transmission project construction cost control.In addition,due to the internal confidentiality of the project construction unit requirements,the scope of the study excluded from the confidentiality of materials and cost control measures,and these materials or internal control measures for power transmission project construction cost control work is likely to be compared important.The author will be with the years of continuous growth and experience of the rich,continuing with the times to update the subject of research,continuous improvement of research results.
Keywords/Search Tags:Cost control, power transmission project, Cost management, Project management
PDF Full Text Request
Related items