Font Size: a A A

Engineering Design And Realization Of Power Mining Control System In Wulanchabu City

Posted on:2018-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:G A ZhaoFull Text:PDF
GTID:2322330515957590Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the continuous development of the economy,the continuous development of power automation and the increasing number of users of electricity,Wulanchabu City,the overall electricity consumption is growing,the power sector in the management of the pressure is also growing.Power consumption control system is a power marketing management of technological innovation,its emergence has greatly improved the power sector power supply efficiency.Therefore,the design of a set of local conditions in line with the specific situation of Wulanchabu power acquisition and control system is necessary.Based on the current situation of domestic and international electric power acquisition and control system,combined with the specific situation of Wulanchabu City,taking the design of electric energy storage and control as the research object,this paper takes Wulanchabu City as a research object,The design of a more reliable and effective electric energy storage and control system is completed.Firstly,the main technologies of power collection and control system are introduced,such as optical fiber communication,GPRS,electric power wireless network,communication channel technology such as power carrier communication,data model of collecting terminal and construction of main station.Then the design of the power acquisition and control system for Wulanchabu City is introduced.The main station system,channel and collection terminal are introduced in this paper.In addition,the paper introduces the design of the corresponding software used in the electric energy storage and control system,such as the design method and choice of the software and the design principle of the database.Finally,the system is put into the engineering practice,the analysis and evaluation of terminal equipment operation indicators,the main station equipment,communication channel operation on-line monitoring,local data collection and analysis of advanced applications,real-time data display,code Maintenance and rights management functions,that is,in practice,verified the feasibility of the power acquisition and control system.
Keywords/Search Tags:Power acquisition and control system, master station, acquisition terminal, communication channel
PDF Full Text Request
Related items