Font Size: a A A

Research On Freeway Construction Project Management Based On A Company

Posted on:2018-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y W BianFull Text:PDF
GTID:2322330515482470Subject:Engineering
Abstract/Summary:PDF Full Text Request
Freeway is the inevitable outcome of the development of social economy.The construction of freeway reflects a national and regional traffic developed and the overall level of economic and social development.In recent years,the government of Jilin province every year in the field of freeway investment as the infrastructure construction first,especially after entering "much starker choices-and graver consequences-in" Jilin province transportation hall strategy,further implement the provincial party committee and government firmly seize the national important opportunities for a new round of the revitalization of northeast old industrial base,to speed up the freeway concentrated into the net as a top priority,the transportation center work to promote the construction of transport infrastructure.Only in 2016,Jilin province is the year plans to invest 24.5 billion yuan,the 12 freeway construction projects,construction mileage reached 1259 kilometers.According to statistics,in Jilin province freeway mileage has reached 3113 kilometers,the implementation of northeast region economic integration strategy,drive the southeastern Jilin province's economic and social development,support long ji diagram open and facing the bohai sea to the south east,accelerate into the "area" national strategic layout is of great significance.freeway construction project because of its geographic span is larger,a long construction cycle,project financing,construction period,quality,safety,and environmental factors,such as a variety of constraint conditions of strictly limited,any one phase or part of the problem,will affect the whole project to achieve the goal of construction of overall.At present,our country freeway construction site management of the project,compared with foreign counterparts both in quality,cost,schedule control and organization planning,human resources management is a big gap.Based on the high-speed long-withering to open A company wolong hill section of the second phase of freeway engineering project as the carrier,analyzes their project site management,analyzes the problems in the process of construction site management,and analyses the existing problems.According to the problems and reasons for improving the management methods and measures,in order to able to finish the project site management improvement goals.This article is divided into six parts,the first part introduced the paper selected topic background,points out that is under the situation of rapid development,the freeway in our country need to be done under the new situation of the project site management.The second part introduces the concepts and theories related to this article,first of all to the project and project management are briefly introduced,then the expressway project management concepts and main methods are introduced.The third part of A company and liao wu period of project construction and site management are introduced,and then analyzes the liao wu section of the site of the project management problems,and according to the existing problems,from personnel,machinery,material,method,measurement,environmental six aspects has carried on the thorough analysis,looking for the answer for the happening of the problem.The fourth part,according to liao wu period of site management existing problems and reasons,put forward improvement goals and principles of the site of the project management,the measures to improve the project management plan.The fifth part set on safeguard measures for the smooth implementation of improved scheme,and then select the scene management of key three aspects to analyze the project site management improvement effect,to prove effective improvement measures.The sixth part is the conclusion and prospect of the article,think through a series of improvement measures,Liao wu section of the site of the project management level will be improved,the goal of the project will be implemented,can also offer other similar project site management experience for reference!...
Keywords/Search Tags:the freeway construction, the site of the project management, the improvement
PDF Full Text Request
Related items