Font Size: a A A

Research On Greenland Cambridge Project Construction Quality Improvement Of Greenland Group

Posted on:2018-10-21Degree:MasterType:Thesis
Country:ChinaCandidate:H K PengFull Text:PDF
GTID:2322330515479231Subject:Engineering
Abstract/Summary:PDF Full Text Request
Real estate industry in China started late,the management level of the backward unable to match the speed of construction investment,combined with the real estate enterprises are eager to pursue market share,expand the scale,neglect the engineering quality,management,quality issues continuously emerging.\ "Jerry-built projects\" frequent exposure,owner complaints,not only the serious influence enterprise's brand image and credibility,but also caused great waste of social resources.As shown in the quality management system has become the real estate group,the top priority of this chapter will combine green Cambridge project for research.This topic to green Cambridge project as the research object,according to the research of the subject,the subject in-depth analysis,and retrieval and analysis of a large number of literature review,after theoretical support part of the research topic,focus on two aspects from the project quality and project quality improvement is discussed.Focus on analysis of the current green Cambridge project construction quality management present situation,analyses the status quo on the green space after Cambridge phased project construction quality problems and causes.After according to the existing problem of the targeted group green space Cambridge project construction quality improvement design,from the project quality system and the system building,responsibility division,the early stage of the construction project management department improve the design and construction process phase ascend the later stages of design and construction design.According to the design plan to deploy the implementation,and combine the actual situation of the green Cambridge project implementation.In the early stage of the construction,it is necessary to pay attention to the quality index in different stages of the build clear,determine the quality control key points.Need to strengthen the material control process stage,strengthening equipment using standardized supervision,strengthen the construction process of monitoring and control model.Later stage need to improve the quality inspection mechanism construction and completion of the inspection process.The plan after the study has entered the preliminary stage of implementation,the implementation plan to ensure group green space bridge project construction quality,improve the quality of the project management pattern,for enterprises to save a lot of cost,for similar projects to provide a high application value.
Keywords/Search Tags:Greenland Cambridge Project, Construction Quality, Improvement
PDF Full Text Request
Related items