Font Size: a A A

Ab Substation Engineering Project Risk Management Study

Posted on:2017-12-22Degree:MasterType:Thesis
Country:ChinaCandidate:N YangFull Text:PDF
GTID:2322330512461241Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid and stable development of China's economy, the demand for electricity energy is getting higher and higher.Electric power industry is the basic industry of national economy, not only plays an important role in the process of economic development, but also is the leading force in promoting economic and social development.Therefore, in recent years, countries around the world and governments at all levels had actively increased investment in the power industry to increase economic efficiency and has a stable industrial structure basis. Industry structure is a very complicated structure, the quality of the substation project construction is particularly important. In view of the existing problems in the substation project risk management and the important status of the substation project construction, it is imperative to strengthen the risk management and assessment.This paper mainly discusses the AB substation risk index and the risk researching process to further propose effective measures to avoid this risk. Through the investigation of many relevant materials and a series of theories, it is confirmed that the AB substation had many risks, which can be further classified and will eventually evaluated the risk assessment level is general level.So, the comprehensive evaluation model can make a deep analysis of various risk factors in the construction process, and points out a series of solutions, which reflects the role of project risk management in the project construction..The full text can divided into 5 parts.The 1st chapter is the introduction, mainly focused on the main research significance and the study background,and detailed account of the research ideas subject, research status at home and abroad as well as the study technical route.The 2nd chapter is the theoretical basis, mainly introduces the basic theories related with this paper, including risk, engineering project risk and risk management,substation construction project of the connotation and characteristics and the commonly used risk assessment method.The 3rd chapter is AB substation construction project overview, including the project profile, the electric power demand forecasting, AB substation project status and existing problems, AB substation project risk management organization and risk management planning.The 4th chapter is the AB substation project risk source analysis, mainly including the AB substation design basis and the scope, the AB substation project management status, the AB substation risk source and the reason analysis.The 5th chapter is the comprehensive AB substation risk evaluation, including substation risk identification, index system evaluation, comprehensive evaluation model and the results analysis and responsible strategies.
Keywords/Search Tags:engineering project, risk management, brainstorming method, subjective grading method
PDF Full Text Request
Related items