In order to ensure safety in production, improve water quality, reduce production consumption and meet the needs of the development of urban water supply, the topic aims at the existing process of South-waterworks, upgrading the water supply system of South-waterworks to achieve automatic control.The main work includes:1?Completing the main water plant equipment selection of automatic control system and system architecture design.2?Transforming of major hardware?software and network include:Control network transformation; PLC transformation and new; Control cabinet transformation; Host software reconstruction.3?Automatic alum, chlorine control,propose control scheme4?Transforming into a water-based on Industrial Ethernet Control Automation Completion control system,which covers the whole waterworks of PLC control system to complete the interface design of waterworks control system eventually. |