Font Size: a A A

The Research On Some Problems About The Application Of BIM Technology On Run Zeyuan Engineering Construction

Posted on:2016-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:S H LiuFull Text:PDF
GTID:2322330488487820Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
In recent years, along with the rapid development of national economy, the construction industry in our country has developed rapidly. Lots of residential buildings and public facilities in complex mould and novel design are springing up. But the slowly updated technology and management level of construction industry in our country does not match with the rapid developed construction market, so that for a long time, the construction industry in our country is in low production efficiency, severe resource waste and low degree of informatization.BIM, that is Building Information Modeling, which is utilizing 3D space modeling as carrier to integrate various information in project, and applying and sharing these information in the stage of architectural design, construction, operation and maintenance. The visualization, modeling and coordination features of BIM technique lay a theory foundation for its application in construction.On the basis of concluding the existed application values of BIM technique on construction, this paper studied the application of Luban BIM software on construction stage under the background of Run Zeyuan project:(1) Introduced the maturely applied BIM software in current construction stage of our country—Luban BIM. And it expounded the application idea and implementation method of Luban BIM technique on construction at the present stage;(2) Specific to the feature of Run Zeyuan project, it established 3D space modeling of civil engineering and mechanical and electrical installation;(3) By use of the “collision check” function of Luban BIM, this paper discussed how to find out the collision problems existing in design drawings in advance, and realized the optimization of construction scheme for Run Zeyuan mechanical and electrical installation project;(4) Made use of the visualization feature of Luban BIM, the engineering drawing jointly checkup, 3D technique disclosure, the accurate positioning of reserved holes on the wall, virtual wondering, construction quality control and accurately calculation of entity work capacity for Run Zeyuan project were realized.The research achievement of this thesis provides a reference for BIM technique application of construction enterprises, and is helpful to improve the construction technology and management level of enterprises.
Keywords/Search Tags:Luban BIM technique, Collision check, Visualization, Virtual wondering
PDF Full Text Request
Related items