Scheduling Research Of X Hospital's Mechanical And Electrical Installation Project Based On BIM

Posted on:2016-05-15Degree:MasterType:Thesis
Country:ChinaCandidate:C Q XieFull Text:PDF
GTID:2322330482967665Subject:Project management
Abstract/Summary:PDF Full Text Request
With the larger hospitals, hospital mechanical and electrical installation project is becoming more and more complex, which makes the difficulty of the mechanical and electrical installation project schedule planning. Traditional project schedule planning depends on the staff more experience and ability, and the experience of the management mode of often unpredictable effects, at the same time, the traditional technology has many limitations, is not conducive to the standardization of the project schedule planning and refinement. The emergence of BIM technology to solve the problems existing in the traditional schedule provides a possibility, in recent years, more and more applied in the stages of engineering construction.Based on BIM technology at home and abroad, the mechanical and electrical installation project has carried on the induction, research and application status of the current hospital present situation of the traditional mechanical and electrical installation project schedule planning are described. And analyzes the problems existing in the traditional project schedule management process, as well as the traditional two-dimensional construction drawing, the expression mode of traditional schedule, project participants communication problems. X hospital mechanical and electrical installation engineering project as the research object, from the dynamic visual expression accurate statistics, the schedule of quantities, the various project participants and efficient communication, the owner of the project success degree aspects, elaborated the project progress plan for BIM technology needs. Based on BIM from schedule management process, the project schedule management system architecture, the project schedule planning process, comb in theory based on BIM X hospital approaches to realize the project schedule. Then select specific BIM software operating platform, through the BIM model building, pipeline comprehensive optimization layout, accurate quantity statistics and virtual construction BIM model is established, so as to realize the simulation of X hospital mechanical and electrical installation project schedule and optimization. In order to better implement based on BIM X hospital project schedule, project level BIM standards are given in this paper, based on the aspects of organization structure and team construction of BIM safeguards.Based on BIM technology in X hospital study of mechanical and electrical installation project schedule, proving that BIM technology applied in hospital progress plan, the feasibility of the application of BIM technology can improve the rationality of project schedule planning, reduce the engineering change, make the information more efficient, complete, enhance project parties communication and collaboration. Hope this can work for hospital be used for reference in mechanical and electrical installation engineering project schedule planning.
Keywords/Search Tags:Medical building, Mechanical and electrical installation project, BIM technology, Project scheduling
PDF Full Text Request
Related items