Research On H Project Schedule Design Of DSIC Company

Posted on:2016-11-28Degree:MasterType:Thesis
Country:ChinaCandidate:J T YuFull Text:PDF
GTID:2322330482967269Subject:Project management
Abstract/Summary:PDF Full Text Request
Project schedule of preparation is one of the important elements of project management,based on the schedule,can make the implementation of the project to from an organic whole.DSIC company production management system is still built around the conventional ship construction.Due to special technical requirements and management requirements of the project H,DSIC company the production management system application in H project there are many does not adapt,combined with the actual situation of H project,the project H reasonable progress planning and planning,to ensure the project schedule plan in engineering practical guidance,be H project to research and solve the problem of the most important.This paper introduces the involved in the study of some theories and methods about the project schedule planning,and with the implementation of the project H as the background,in view of H project progress management requirements,starting from the actual of H project schedule management,project schedule planning process and will be H method and DSIC adopted by the company prior to the similar projects in the planning process and method of differences are analyzed.The reference of related literature at home and abroad,on the theory of project planning of H project planning system and planning process to carry on the scientific and reasonable design.Project progress plan of the basis method of H project work breakdown structures,to develop responsibility assignment matrix,the logical relationship between establishing process,according to the different characteristics of each component purpose,take different approaches to estimate the time limit for a project,eventually developed H integration project network diagram and determine the critical path,raise the level of the project planning.At the same time,based on the experience of the similar project plan management,put forward the H project organization structure,planning division of coordination and review mechanism safeguard measure progress.The results of the study will be able to in the process of H project schedule planning is to promote and deepen,follow-up for H project construction to provide the necessary help,to standardize the project schedule management has the important practical significance,for the company and the domestic shipbuilding enterprises similar ship construction project schedule management has important reference significance.
Keywords/Search Tags:Shipbuilding, Project management, The project schedule plan
PDF Full Text Request
Related items