As per Nan Pu Oilfield Exploration Plan,it will include 5 structures: Structure No.1,2,3,4 and 5.Totally 8 Platforms included in Structure No.2 as Platform No.5,6,7,8,9,10,12,20,and with function of treatment oil,gas and water input from Structure No.3,Platform No.11 and 21.According to the production capacity and relative location of each platform in Structure No.2,also following concerning of the sequence of first oil time,routing of oil and gas transportation,location of oil/water separation and produced water treatment,to optimize the platform function to meet the principle of economic and reasonable for sizing optimization..Conclusion is multiphase production transportation from Platform No.6 and No.12 to Platform No.5 for further treatment.Platform No.5 will be a Central treatment plant in Structure No.2.On other side,all the liquid/gas from platform No.7,9,10,11,20,21 will be routed to Platform No.8 to remove free water,and lower water-cut oil and gas will be revert to No.5 by pipeline respectively. |