Font Size: a A A

Research On Safety Risk Identification And Prevention Measures For Storage Tank Project

Posted on:2017-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:J W WangFull Text:PDF
GTID:2311330482994571Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
With the development of national economy and the growth of energy demand,the price of crude oil continues to decline,crude oil reserves of the building or will usher in a peak.Due to the large storage tank project has the characteristics of large quantity,complex construction process,there are many different kinds of materials,cross construction trades more,and field or in the open air,high-altitude operations,and many,many unsafe factors,construction period is long.Therefore,to carry out storage engineering construction safety risk identification and anti fan measures for safe,high quality and efficient storage tank construction to have the important meaning.In this paper,the author will combine the construction companies,Shanshan crude oil commercial reserve base project,through the beforehand risk identification,analysis and evaluation,formulate corresponding management measures,at the same time,are involved in the project risk,the existence of hidden summary,detailed risk reduction measures and risk prevention measures,so as to guide the enterprises and peer to improve the level of safety management in the future to engage in large storage tank project,effectively reduce and control the construction risk,maximize reduce accidents to ensure safety in production in the whole process of the involved in the large storage tank project construction types,procedure,activity place.
Keywords/Search Tags:Storage tanks, Risk identification, Preventive measures
PDF Full Text Request
Related items