Font Size: a A A

Study On Network Model And Reasoning System Of Grubing Project Superseding Of Mine

Posted on:2018-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y F YanFull Text:PDF
GTID:2310330536966030Subject:Mining engineering
Abstract/Summary:PDF Full Text Request
In the process of coal mining production and construction,the succession of the excavation project directly affects the economic and social benefits of the enterprise,and it is necessary to deal with the problem of succession between the excavation projects.Therefore,the preparation of the tunneling project is an important part of the mine production management center.In China,mine production technician often uses the manual way to prepare the succession plan for excavation works.This traditional preparation method is not only inefficient and easy to make mistakes,but also inconvenient in the modification of the data.In recent years,the system engineering and computer artificial intelligence in the coal industry have a wide range of applications with the development and improvement of computer technology.Especially in the mine intelligent decision-making and succession planning,there is a vigorously developed to assist the production technician.The excavation project takes over the succession plan,which effectively solves the shortcomings of the manual way.In this paper,we first analyze the present situation and the existing problems of the succession of mine project,and point out the purpose and method of this research.Then we introduce the model of excavation engineering based on graph theory,and expound the concept of model.The application of directed graphs in this research reasoning system is introduced,and the virtual engineering is introduced into the network model.The simplified process of complex network path is described.Finally,based on the graph theory,the network model of the tunneling engineering is the theoretical basis and the research ideas,and the rules and algorithms of the succession reasoning of the excavation project are extracted and summarized.The reasoning system of the succession plan of the tunneling project is designed.At the same time,the block diagram and the realization principle of the module are introduced.Based on the actual data of the construction project of FengHuangTai Mine in Puxian,Shanxi Province,this paper analyzes the reasoning system of the developed reasoning system and analyzes the comparison between the process and the original manual preparation of the Phoenix Palace mine.The results show that the system has good effect,and can reduce the workload of the production technician.At the same time,it can provide an effective driving succession program,and has a very good use value and economic value.
Keywords/Search Tags:systems engineering, network model, grub project superseding, reasoning system
PDF Full Text Request
Related items