Font Size: a A A

The Post Occupancy Evaluation Research On Henqing Of Multi Cogeneration

Posted on:2016-04-08Degree:MasterType:Thesis
Country:ChinaCandidate:Y KuangFull Text:PDF
GTID:2309330482455256Subject:Project management
Abstract/Summary:PDF Full Text Request
Hengqin is located in the south of Zhuhai, on the west side of the Pearl River Estuary, adjacent to Macao. According to the State Council "regarding the development of Hengqin relevant policy approved", "Hengqin will be built for the Hong Kong Special Administrative Region sar". Hengqin associated for energy and gas station not only bear the Hengqin island’s energy supply and demand, but also to meet the growing urban area of Zhuhai City electricity demand. Hengqin associated for energy and gas station at the same time by Modaomen watercourse and hydro logical factors influence, the site faces both riverside and coastal complex geological conditions, to the project brought certain complexity. With the first 2 sets of 390 MW multi joint for the completion of the gas power station and matching network system, through carries on the project post evaluation, not only for the follow-up project to provide advice, also can provide the reference for the similar energy Riverfront Marina complex geological conditions in station.
Keywords/Search Tags:Coastal riverside & Coastal seaside, Multi link supply, Post evaluation, BIM
PDF Full Text Request
Related items