| At present, China’s construction industry has developed rapidly, building materials costs account for a large proportion of construction costs, it generally account for60-75%of project Jian Fei. And because of the characteristics of building products and market factors, engineering material is variety, and supply channels are multi-cultural. However, management cost of procurement of materials is one of the largest part of funds spent in the Project Procurement Management, it is out of control easily in construction project cost management, and it is the parts that is involved in loss of public self-serving corruption. There for,it is the most direct result that you can reduce the costs, and it is the core of economic management. Material procurement cost management superiority or inferiority related to the success of the entire project cost management, it has become the key areas for the construction industry on construction project managementIn this paper, after reading the theoretical about the cost of procurement-related of project materials, overviewed the basic content and meaning of cost control, the project cost control principles and methods, the project definition and type of procurement, project procurement methods, the project procurement procedures and project material procurement cost control methods. On the basis of the relevant theory, the test explained the cost control of materials for supporting project as an example. And the article introduced detailed the bidding control of procurement materials, material procurement control process, materials procurement cost control content. it proposed cost control method of materials purchase aiming at the shortage of supporting projects of Qiangang.In this paper, the method of standardize research and case study, The full access to literature at the same time, Based on field survey methods, In-depth practical operation project, collected a large number of materials relating to the business first-hand the cost of procurement of information, analysis for the classification from the post, In the supplier management system and evaluation system integrity, vendor instability, high cost of procurement, purchasing and other aspects of performance evaluation pointed out the steel supporting the project to move in the material procurement cost control problems and make the cause analysis, propose to control the and lowering of the corporate procurement of project materials, the cost of countermeasures and suggestions. The paper propose cost control methods and implementation. |