Font Size: a A A

Yangjiang 220kV Climbing(High) Supporting 220kV Line Project Management Research

Posted on:2015-06-04Degree:MasterType:Thesis
Country:ChinaCandidate:G S ChenFull Text:PDF
GTID:2309330464462740Subject:MBA
Abstract/Summary:PDF Full Text Request
With the implementation of projects become more frequent, project management as an effective guarantee for the completion of the project subject by the experts and scholars paid more and more attention, it is widely used in each field of the enterprise. This paper is combined with the Yangjiang 220KV(high) supporting the implementation of climbing 220 KV line engineering project management, analysis of the study in the project implementation process of enterprise A theory, the contents of the study mainly concentrated in the project schedule management, project human resource management, project quality management, project risk management, and describes the specific measures taken by the project management enterprises, provides some reference for power engineering project by project management.This article is divided into four main parts: the first part is the introduction part, the research background of this paper, the research significance, thesis framework, research methods, the innovation and deficiencies are summarized, summary of related theory is the theoretical foundation of the thesis, this part mainly introduces the overview of research of these theories this paper mainly relates to the theory of knowledge as well as the domestic and foreign scholars, and some comments on the theory of the basic theory in the domestic and foreign experts and scholars on the. The second part mainly introduces the main problems facing the background of the project and project implementation process, was proposed to solve this problem. The third part is the main body of this paper, mainly introduces the A enterprises in Yangjiang 220000 volt climbing(high) adopted the implementation process of supporting the 220000 volt line project in the specific project schedule management, project human resource management, project quality management, project risk management measures, A enterprises will be embodied from theory to practice the second part is to put forward the solutions to the problems. The fourth part is the conclusion part of this paper, is the A business to use the theory of project management experience in the process of project implementation summary.Through to the Yangjiang A company 220 KV climbing(high) research on related theories of project management, supporting the 220 KV line of the project practice, not only can enhance the A company’s project management theory knowledge and the actual operation ability, more can provide reference work for related enterprises project management.
Keywords/Search Tags:Project management, line project, schedule management, risk management
PDF Full Text Request
Related items