Font Size: a A A

Project Management Of Third-party Certification And Testing Laboratory

Posted on:2015-06-13Degree:MasterType:Thesis
Country:ChinaCandidate:Y J GongFull Text:PDF
GTID:2309330452466853Subject:Project management
Abstract/Summary:PDF Full Text Request
Stabilizing step by step with the times, increasingly peaceful and stabledevelopment of the world, from the management of the project managementknowledge areas emerged as an all walks of life and various operators managers need.This article will be a third-party certification laboratory project communication andproject management in the field of risk management, research and analysis, alsoconducted detailed studies of its management model and management methodsinvolved, and multi-project management and risk management basis ways andexisting third-party certification laboratory-based management model is more suitablefor the analysis of the third-party certification laboratory management mode.In today’s growing communications industry, many communication techniquesand technologies are being developed rapidly, and gradually move toward the use ofcommercial and enterprise management of the road. However, for thecommunications industry technology development and technology commercializationprojects cannot be without these tricks, it is not just the communications industry, foreach industry regulations are used to measure the development of productspecifications and requirements, and whether it can be safe to use a baseline. Themain research topics of this paper---third-party certified laboratory projectmanagement and risk management. This article also analyzes proceed from existingdomestic and foreign laboratories architecture and management model, and presents itto a third-party certification laboratory for change of management, the potential as acontent-based management mode architecture, critical research and analysis, while thecharacteristics of management mode called it TLK (Transformational&Latent&Key)management. According to the characteristics of the third-party certification testinglaboratory by TLK management, for the whole project process of nodes, to analysistransformational, latent and key in each node of the project. And in view of TLKmode, the risk management from understanding, recognition, assessment and analysis.From laboratory testing to verify the department’s testing process TLK managementmode for detection and analysis of project management ideas, to verify the risk ofreducing cost, improving the efficiency of the result. From internal management andoutsourcing management were also made a corresponding analysis. Form the SARand OTA testing department of the laboratory verified TLK management mode fordetection and analysis of project management ideas, from internal management andoutsourcing management were also made a corresponding analysis.
Keywords/Search Tags:project management, risk management, certification, testing
PDF Full Text Request
Related items