Font Size: a A A

D Intelligent City Core Area Distribution Network Project Management Research

Posted on:2015-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:N SunFull Text:PDF
GTID:2309330431452267Subject:Business administration
Abstract/Summary:PDF Full Text Request
The smart grid is divided into intelligence generation, intelligence transmission, intelligent substation and Smart Substation of four parts. Intelligent power distribution network as a part of smart grid key, the user oriented, distribution network is stable or not directly related to user satisfaction, power supply quality, society, enterprise, the masses of the electric power enterprise visual impression. In the past time, distribution network construction investment is relatively insufficient, the grid structure, and the low degree of automation, compared with foreign countries there are many gaps. Therefore, in recent years the state has given adequate attention of smart distribution network, to carry out large-scale building intelligent distribution network in the provinces and municipalities. D was one of them, the construction of smart distribution network is also similar to other projects, due to the lack of top management support, quality and cost control of high difficulty, user intervention management specification, less in construction and various rules and regulations are not perfect, the division of responsibility is not clear, there are many problems in the construction process, these issues affecting the engineering quality and construction progress, but also produces a bad effect on the safety of personnel.How to ensure completion of process system of intelligent distribution network in the engineering quality, is the guarantee of automation engineering intelligent distribution network later can stable, reliable operation. Combined with the engineering construction the core area of smart distribution network D characteristics, project management scheme adopted in detail D construction core area of smart distribution network in the whole process, including project start-up preparation; develop schedule, cost plan project work; control, from the progress in implementation of the project cost control quality control of project management, such as all-round; all aspects of the project approval and management and evaluation, analysis of present situation of project management for intelligent distribution network, the problems found management mode. Compared with the international advanced management mode, to identify areas suitable for D intelligent network engineering construction management mode.
Keywords/Search Tags:Intelligent distribution network, project management, Schedulecontrol, power
PDF Full Text Request
Related items