Font Size: a A A

Design And Implementation For Bank Flexible Scheduling Management System Based On B/S Mode

Posted on:2016-04-30Degree:MasterType:Thesis
Country:ChinaCandidate:C LinFull Text:PDF
GTID:2308330482957929Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In the current bank’s flexibility in the process of scheduling management, scheduling work by the staff manual arrangement, still use some related algorithm to calculate, business content submitted by Banks for rota generated manually. This way is inefficient, and at the same time is the most important of the elasticity change banking business is dynamic, it is difficult to estimate, bank scheduling need frequent changes, at the same time, also need to new work cycle scheduling process, this cycle shorter work cost a great deal of staff working hours. Therefore, this system design a flexible scheduling and resource scheduling management system, the system is designed to solve the scheduling management in the problems of low efficiency, poor flexibility, the system’s main work is as follows:1, designed an intelligent scheduling algorithm based on greedy strategy, the algorithm includes two parts. The intelligent scheduling and conflict resolution, In the design of the algorithm based on the actual situation of bank flexible scheduling, using the greedy strategy, will bank department, staff, on duty date three elements for automatic arrangement, at the same time in the personnel arrangement in considering human factors such as staff rest intervals.2, the core of the system function module was designed and implemented, mainly including the scheduling plan management, scheduling parameters setting, scheduling and report management, scheduling and scheduling resources management core function modules of the detailed design and coding, based on SSH technology system is the realization of the function of client and server, and through the test and analysis of the system, and the test results can meet the demand of the user.In this paper, the system test in accordance with all relevant software engineering theory, including the system analysis, system design, system implementation and testing, such as the core development process, the development of the system based on Web technology such as SSH, use SQLServer2008 database management system for data storage and maintenance. System development to meet the user requirements, through the test, can meet the demand of practical application.
Keywords/Search Tags:Flexible scheduling, the banking system, resource management and scheduling algorithm, information management system
PDF Full Text Request
Related items