Font Size: a A A

The Design And Implementation Of Trust Business Management System For China CITIC Bank Dongying Branch

Posted on:2015-01-30Degree:MasterType:Thesis
Country:ChinaCandidate:Q Q RenFull Text:PDF
GTID:2308330461989847Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In recent years, China’s economic market is stable, financial services are increasing, as well as business. However, because CITIC Bank Dongying Branch did not take into account of such a large user group in beginning of design, and its trust business is still stuck in the manual stage, thereby a lot of mistakes when conducting trust business management. Manual operation is tedious and hard to manage and inefficient, seriously affecting the status of Dongying in Shandong Peninsula Blue Economic Zone. At the same time, the computer industry, especially the Internet information technology, is rapidly developing, many major industries and public institutions have their respective management systems. The development situation at home and abroad and the status of CITIC Bank Dongying Branch in show that it is an effective way to develop a suitable trust business management system for solving the problems CITIC Bank Dongying Branch faced.The system uses the widely used J2EE framework, which is stable and safe. It is suitable for the needs of CITIC Bank Dongying Branch. In addition, the AJAX and Jquery technology has good interactivity and excellent asynchronous characteristics, so in order to help users experience better, the system uses this technology. The system uses UML technology to make detailed description for requirements and design of the system. Using E-R diagram for specific description of the database. Finally, doing rigorous and comprehensive testing for the system through system testing and other methods, ensuring the effective operation of each system function.The system has services of workflow management, project management, report management and account management. Workflow management is primarily responsible for initiating workflow, forwarding workflow, workflow management, etc. Project management is primarily responsible for project freeze, project revocation, project home page management, appointment of project personnel and disclosure report generation. Report management mainly complete the show of balance sheet, valuation sheet, income statement and other financial special statements, and operation of saving, exporting, querying non-financial special reports, like process tracking tables. Account management mainly complete log query for bank accounts and stock exchange fund accounts.After the completion of development and design, comprehensively testing the system, mainly including functional testing, system stability testing and system pressure testing to ensure the system can be stably and efficiently operated in CITIC Bank Dongying Branch. During the development process, the thought is rigorous, the development process is normative, the system test is detailed, therefore the system can be operated stably and efficiently. The system effectively allow the front desk staff breaking away from complex trust business work, and work efficiency has been improved a lot, enhancing the core status of Dongying City in Shandong Peninsula Blue Economic Zone.
Keywords/Search Tags:MVC, trust business management system, workflow management, JavaEE, UML
PDF Full Text Request
Related items